In 2018, PCD was called to assist in providing a design-build solution to outfit a newly constructed building at Roseland University Preparatory campus. Their campus includes a “Big Room” space where the students can gather to see presentations in a large theater-style open-space room, as well as AV installations throughout various classrooms.